10 ton overhead crane for sale to Ethiopia. overhead crane installation service for our Ethiopia customer. 6 sets 10 ton Double Girder Overhead crane machine installation in Ethiopia pipe-making plant. Learn 10 ton overhead crane specification and transaction process to get the crane information that you need.
10 Ton Overhead Crane Specification
Lifting capacity: 10 Ton
Lifting height: 9 meters
Span: 24 meters,
Voltage: 380V, 50Hz, 3P,
Overhead Crane Project Introduction of Pipe-Making Plant
Since 2016, Ethiopia economy has been developing rapidly, the government support lots industries to establish their new workshops, so Mr Ashenafi built three new warehouses for pipe making. We Dongqi Group contacted Mr Ashenafi from the beginning of January, 2016, after learning the crane needs of pipe-making warehouse, our sales director Mr Oscar was responsible for giving below solutions:
10 Ton Overhead Crane Drawing
Mr Ashenafi was very satisfied with above crane solution, after a period of communication about some crane technical question, then sign the contract at the end of 2016 and totally amount is US DOLLARS 143,000.00.
Crane Installation Engineer Reached to Ethiopia
On 8th May, Our technical team visited our Ethiopia customer Pipe-Making Plant, for installation and commission of 6 sets 10 ton double girder overhead crane, which is shipped and arrived customer’s plant last year, on that day Mr Ashenafi arrange people to pick Mr Chen up at the airport.
Preparation before Overhead Crane Installation
On the second day after arrival, Mr Wei request to go to warehouse to check all the overhead crane girders, boxes, electrics boxes, beams and rails and other crane spare parts which could ensure all crane parts are ready, then Mr Chen had a meeting with Mr Ashenafi and his team, Mr Wei told them to prepare related overhead crane installation tools, such as mobile crane, welding machine, screwdriver, forklift, lever etc, and how many people it will need to ensure the overhead crane installation process operate smoothly.
10 Ton Overhead Crane Installation Process
The 6 sets overhead crane will be used in three warehouse:
Firstly Mr Chen arrange one small team to lifting the beam, rails on the brackets, then welding them well;
Secondly Mr Chen adjust the rail centers distance to ensure the overhead cranes can be settled well;
Thirdly, Mr Chen arrange forklift driver to assemble these crane girders together, then asked mobile driver to lift the girders on crane rails well. After that, lifting the hoist trolley on the two main girders; at last Mr Chen connect the electrical cables in person to ensure the cables connections everything goes well.
Until 31th May, 5 sets overhead crane installation have been finished well, the other set will need extra 3 days, after that, Mr Chen will arrange the heavy load to commission the crane and adjust the working stability. After all installation and commission finished, he will teach the workers how to operate and maintain these overhead cranes, everything goes smoothly during the overhead crane installation, commissioning and inspection